I would like to know your thought about this migration procedure:
1) Server 1 : NPM + Poller Server 2 : DB
2) Add third server with additional Poller. Server 3 : Poller
3) Move devices to new poller at Server 3
4) Move NPM from Server 1 to Server 3
5) Move DB from Server 2 to new Server 4 DB
Step 4 and 5 are at the same time.
Any thoughts or suggestions?