Quantcast
Channel: THWACK: All Content - Network Performance Monitor
Viewing all articles
Browse latest Browse all 21870

Integration of Powerchute with Solarwinds

$
0
0

Is there a way when the power goes out and the alert is triggered to have Power-chute power down the VMs and then the Host server itself in the correct order to maintain stability.  Is is possible to have the alert trigger to tell Power-chute to power down and power back up when the power returns to main line.


Viewing all articles
Browse latest Browse all 21870

Trending Articles